July 9, 2018:  Signs are going up! Moving in SOON!

June 12, 2018:  Setting the sanitary sewer pipe using horizontal directional boring!

June 12, 2018:  Setting the sanitary sewer pipe using horizontal directional boring!

June 8, 2018:  Offices are getting final touches!

June 8, 2018:  Lunch room has cabinets now!

April 12, 2018:  Getting ready to reduce bottled water usage!

April 11, 2018: Corridor floors are under way!

 

April 11, 2018: Flooring is in.  Ceiling Grid is ready for tiles!

April 11, 2018: Somewhere we hope our residents will not ever need to visit!

April 11, 2018: Front doors are in!

February 5, 2018: Police Station hallway is painted!

February 5, 2018: Fire Station hallway drywall is up!

February 5, 2018: Fire Station apparatus bay is starting to get finishing touches!!

January 16, 2018:  Painting fire station walls!

January 16, 2018:  Hanging drywall!

January 16, 2018:  Hanging drywall!

January 16, 2018:  Hanging drywall!

 

December 22, 2017:  Running many miles of wire!

December 22, 2017:  Interior is now heated!

December 22, 2017:  FInal roof section underway!

December 22, 2017:  Locker showers have arrived!

 

December 11, 2017:  Aerials of new building from Liberty Belle Drones.

December 11, 2017:  Aerials of new building from Liberty Belle Drones.

December 11, 2017:  Aerials of new building from Liberty Belle Drones.

December 11, 2017:  Aerials of new building from Liberty Belle Drones.

December 11, 2017:  Aerials of new building from Liberty Belle Drones.

 

December 6, 2017:  Backside of Fire Station.

December 5, 2017:  Community Room South Facing View.

December 5, 2017:  Fire Station Doors.

December 5, 2017:  Fire Station Bunk Room.

Novemebr 6, 2017:  Interior wall framing continues.

Novemebr 6, 2017:  Walls are bing insulated.

October 18. 2017: Interior walls are being set.

October 18. 2017: Brick is going up!

September 26, 2017: Curbs are going in.

September 26, 2017: Metal stud walls are going up.

September 20, 2017: Aerial (courtesy Liberty Belle Drone Imaging Services).

September 20, 2017: Aerial (courtesy Liberty Belle Drone Imaging Services). 

September 19, 2017: Hanging HVAC Ductwork in the Admin Portion of the Building.

September 19, 2017: Community Room / Multipurpose Room.

September 19, 2017:  Fire Station (rear).

September 11, 2017:  Police Station.

August 18, 2017:  Police Station.

August 18, 2017:  Fire station.

August 18, 2017:  Restrooms are roughed in.

August 22, 2017:  Installing the radiant floor heat for the fire station.

 

August 18, 2017:  Continuing the police station block wall.

August 18, 2017:  Continuing the police station block wall.

August 18, 2017:  Preparing the fire station floor for radiant heat and concrete.

August 15, 2017:  Keeping all of the electric organized!

August 15, 2017:  Setting steel.

August 15, 2017:  Laying block for the police station walls.

August 8, 2017:  Setting concrete for fire station floor drains.

August 8, 2017:  Steel frame is being erected.

August 7, 2017:  Steel frame is being erected.

August 1, 2017:  Pouring the fire station floors.

August 1, 2017:  Pouring the fire station floors.

July 25, 2017:  Pouring concrete footers in the police station.

 

July 25, 2017:  Preparing to pour floor slabs in the police station portion of the building.

 

July 25, 2017:  C.S. Davidson testing concrete samples.

 

June 21, 2017:  Electrical conduit is being installed!

June 21, 2017:  Piers are ready for steel!

June 21, 2017:  FIre Station Foundation is done!

June 9, 2017:  Walls are being constructed!

June 9, 2017:  Footers are in place!

June 9, 2017:  New utility poles are being set (so the fire engines can get in and out under the wires!).

June 1, 2017:  Digging out the stormwater basins.

June 1, 2017: Preparing for footers.

June 1, 2017: Compacting the sanitary sewer trenches with a remote compactor.

May 23, 2017: Installing the sewer pipes and preparing footers.

May 16, 2017:  Panoramic view from the furure Board of Supervisors meeting room.

May 16, 2017:  Moving more dirt!

May 10, 2017: Compacting the slab base.

May 9, 2017:  Making progress now that it has been dry for a couple of days!

 

May 8, 2017:  Continuing to prepare the building slab base.

 

May 5, 2017:  Not much happening today, other than rain!!

 

May 4, 2017:  Preparing the base for the building slab!

 

April 27, 2017: Excavating Continues!

April 26, 2017: Project Trailer Has Arrived!

April 24, 2017: Removal of Topsoil (Photo: WHFR)

April 21, 2017:  Groundbreaking (Photo: Buchart Horn)

Left to Right:  Mark Pugliese (Police Chief), Andrew Stern (Township Manager), Kent Gardenr (Supervisor), Frank Burkhart (Supervisor), Dave Dumeyer (Chairman - Supervisors), Jason Sauder (Deputy FIre Chief), John Leas (President - WHFR), Kirk Ament (Trustee - WHFR)